·Cleaning efficiency improvement
Reduce cuttings bed height at given Flow Rate from 30% to 50%.
Improve Erosion Bed rate at given RPM more than 40%.
· Rig time saving
Circulating time to recover cuttings can be decreased by more than 50%.
Back reaming operations can be reduced or eliminated.
increase rate of penetration.
·Frictional loading improvement
Torque & Drag loading can be decreased by 40%.
Reduction in Pressure Losses up to 50%.
🐽
·Reduce downhole failure risk and eliminate differential sticking.
© 2018 HI LONG GROUP OF COMPANIES, All Rights ReservedPrivacy Policy